Site Selection & Parcel Zoning
Step 1 of BuildoutSelect a parcel to establish your campus footprint. Agricultural parcels are cheap but trigger fierce township rezoning pushback; brownfield industrial sites have heavier substation hookups ready.
White-Space Tile Deployment
Select hardware tool below, then click any tile on the Data Hall canvas.
DATA HALL FLOOR PLAN // HOT & COLD AISLE MATRIX
NOMINALHover or click tiles to inspect & deploy racks, CRAH units, PDUs, or fiber core switches.
Stage Objectives
0 / 5Wholesale & Enterprise Tenants
MRR RevenueSign tenants once you have sufficient power, cooling, and Level 2 network readiness.
NOC & Township Event Feed
Level 2: Network Engineering Lab
5 TasksReal data centers fail when optics mismatch, single-point-of-failure cables lack LACP/MLAG redundancy, or BGP peers lack route policies. Complete all 5 tasks below!
1. Select Cable & Optic Media
Pick the physical layer cable before clicking two rack ports to patch them together.
Installed Patch Matrix
42U RACK ELEVATION // LEAF-SPINE & OOB PATCHING
Click a source port, then click a destination port to run fiber, DAC, or Cat6A patch cords.
Scroll the rack sideways on smaller screens, or use the port selectors below.
Repair cabling or commit configuration manually, then rerun diagnostics. Assisted restore supplies the repair.